Skip to content

Latest commit

 

History

History
44 lines (37 loc) · 2.4 KB

DR_PLAN_IMPLEMENTATION.md

File metadata and controls

44 lines (37 loc) · 2.4 KB

Disaster Recovery Plan — Implementation Notes

This note summarizes what changed in docs/disaster-recovery.md to close out the DR planning issue. It exists because the code/doc diff for this issue is small relative to the size of the underlying plan — most of the DR content (failover procedures, state recovery, RTO/RPO tables, and per-scenario recovery drills) already existed in that document. What was added here is specifically the pieces that were missing.

What was already in place before this change

  • Failover procedures for admin key loss, contract redeployment, RPC outage, interrupted migrations, frontend outage, API server compromise, contract bugs, and search-index corruption (disaster-recovery.md §1).
  • Backup strategy and automated state snapshots (§2).
  • Recovery Time Objectives / Recovery Point Objectives per scenario (§2.3).
  • A step-by-step recovery runbook (§3).
  • Recovery testing drills — key recovery, redeployment, snapshot/restore, RPC failover, emergency pause, API secret rotation — all already run on a defined cadence, several already quarterly (§4).

What this change adds

  1. §5 Roles & Responsibilities — a named-role table (Incident Commander, Chain/Contract Lead, Infra Lead, Data/Recovery Lead, Communications Lead, Scribe) so a DR event doesn't stall on "who does this," plus an escalation path describing how the Incident Commander role is assigned and handed off.
  2. §6 Communication Plan — internal and external communication tables (audience, channel, cadence, owner), message-content guidelines, and a post-incident communication step, since the existing doc had no dedicated communication section.
  3. §7 DR Testing Schedule Summary — a single consolidated table pulling together the drill cadences already defined in §4, plus a new quarterly full-team tabletop exercise that exercises the new §5/§6 roles and communication plan end-to-end, not just the technical recovery steps.

Why extend the existing doc instead of writing a new one

The existing docs/disaster-recovery.md already covered the technical recovery procedures and RTO/RPO in detail. Splitting roles/communication into a separate file would have forced readers to cross-reference two documents during an actual incident; keeping it as one document with clearly numbered sections was the lower-risk choice for something meant to be read under pressure.