Three years of plant telemetry (2023-2025): 35.3M units, 26,304 production hours across 3 lines, ~726k defects, ~8.1k equipment faults. Every figure below traces to a named SQL view over data that passes the integrity checks on the Methodology panel. Fully synthetic, seeded, no proprietary data.
This report is built to answer the questions automotive plant management asks, not to display vanity metrics. Each finding maps to a decision.
Plant OEE = 90.3% (Availability 93.0% x Performance 99.2% x Quality 97.9%),
consistent across all three lines. OEE is shown with its three loss buckets and
the formula, so a reviewer can see exactly how it is derived
(v_oee, v_oee_by_line).
Where output is lost (no dollars - downtime hours + scrap units):
Final Assembly and Paint are the largest combined loss sources; Spot Weld is the
single biggest scrap origin. Final Inspection shows high equipment downtime but
near-zero scrap origin - it catches defects, it does not create them, so
corrective spend belongs on the process stations upstream (v_loss_by_station).
Decision: fix Paint and Final Assembly first; do not chase the inspection gate.
D-crew (nights) takes ~30% longer to clear the same faults than the best
day crew, concentrated in the pre-handoff window. Same equipment, same fault
mix - the gap is repair speed and coverage, and it never appears in daily output
totals (v_mttr_by_crew, v_shift_handoff_effect).
Decision: a staffing/coverage problem, not an equipment problem.
~69% of defects are caught downstream of where they were created. The top three
process stations (Paint, Final Assembly, Spot Weld) create ~63% of all scrap,
but most of it surfaces at Final Inspection (v_rootcause_ranking,
v_propagation, v_detection_ranking).
Decision: target quality effort at origin stations, not the detection gate.
The quality trend independently surfaces real operational events straight from the fact tables, each matching the ground-truth log:
| Event (date) | Recovered from data |
|---|---|
| Weld-cell retooling (Apr 2024) | Spot-weld defects step down ~43%, permanently |
| Supplier fastener bad batch (Oct 2024) | Final-assembly defects spike, then recover |
| New model-year launch (Jan 2025) | Yield dip + recovery on Trim/Final Assembly |
| Paint-booth upgrade (Sep 2025) | Paint defects step down |
| PM / reliability program (Sep 2024) | Mechanical faults down ~22% (6 months after vs before) |
Decision: proof a process change moved the number - a step-change, not noise.
Per-robot fault counts with a 2024-to-2025 trend flag produce a replace-or-overhaul
shortlist; several top contributors show a rising fault rate
(v_robot_candidates). Thermal faults track summer severity (2025 the worst heat
year), separating a seasonal pattern from a real regression (v_summer_thermal).
Decision: schedule the rising-trend robots for overhaul before next year.
A dedicated panel shows row counts, referential-integrity checks (orphan faults,
orphan shift links), yield reconciliation, null checks, the date range, and the
provenance + seed (v_validation). All integrity checks pass. This is the
"where did this come from and why can you trust it" section desk dashboards omit.
Executive (OEE + KPIs) · Where output is lost · Shift analysis · Defect origin vs detection · Event rediscovery · Reliability & capital plan · Methodology & validation. Each carries a plain-English "what this means / what to do" read.