Skip to content

chore(deps): bump thiserror from 2.0.20 to 2.0.21 in /fuzz #687

chore(deps): bump thiserror from 2.0.20 to 2.0.21 in /fuzz

chore(deps): bump thiserror from 2.0.20 to 2.0.21 in /fuzz #687

Triggered via pull request September 30, 2026 18:24
Status Failure
Total duration 1h 40m 25s
Artifacts –

validate-shared.yml

on: pull_request
Test loom-shared
1m 36s
Test loom-shared
Check API Stability
7m 49s
Check API Stability
Format and Lint
11m 26s
Format and Lint
Verify Architecture
11s
Verify Architecture
Test Full Workspace
15m 27s
Test Full Workspace
Integration Testing
Integration Testing
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 1 notice
Format and Lint
Process completed with exit code 101.
Test Full Workspace
Process completed with exit code 101.
Format and Lint
"The ubuntu-latest label will migrate to Ubuntu 26 beginning October 19, 2026. For more information, see https://github.com/actions/runner-images/issues/14748"