For MonthView events resizing, do you need to resize events within one week of for the entire month grid? |
3 replies
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Uh oh!
There was an error while loading. Please reload this page.
First up, thank you for
@mantine/schedule. The resource views that landed in 9.4.0 are exactly what we were hoping for, and we're in the middle of moving our staff scheduler onto them. There's a huge amount of work in that package and it shows.The one thing we're missing is resizing in the month views.
withEventResize,onEventResizeandcanResizeEventare available onDayView,WeekView,ResourcesDayViewandResourcesWeekView, but not onResourcesMonthVieworMonthView, so withResourcesSchedulethe month view keeps drag and drop without resizing.Our bookings are whole days: "this consultant, these five days", where the time of day doesn't really come into it. Extending a piece of work by a day or two is something our users do constantly, and they reach for the end of the bar to do it. Having that in the month view would make it a really natural fit for us.
If it suits where you want to take the package, the props the day and week views already expose would cover it nicely, snapping to whole days rather than minutes:
Related: #8747, which added edge dragging for the day and week views.
More than happy to have a go at a PR if that would be useful, and just as happy to hear if this isn't a direction you want for the month views.