Skip to content

Add bidi text preservation coverage - #4656

Merged
priyankatiwari08 merged 2 commits into
dotnet:mainfrom
priyankatiwari08:priyankatiwari08-directionality-45864
Sep 9, 2026
Merged

Add bidi text preservation coverage#4656
priyankatiwari08 merged 2 commits into
dotnet:mainfrom
priyankatiwari08:priyankatiwari08-directionality-45864

Address directionality test review

f196de2
Select commit
Loading
Failed to load commit list.
Azure Pipelines / PR-SqlClient-Project (MacOSLatest_Sql25 net9_0_AnyCPU_ManagedSNI_2) cancelled Sep 8, 2026 in 1h 30m 11s

MacOSLatest_Sql25 net9_0_AnyCPU_ManagedSNI_2 was canceled

Annotations

Check failure on line 813 in build.proj

See this annotation in the file changed.

@azure-pipelines azure-pipelines / PR-SqlClient-Project (MacOSLatest_Sql25 net9_0_AnyCPU_ManagedSNI_2)

build.proj#L813

build.proj(813,5): Error MSB3073: The command " "dotnet" test "/Users/runner/work/1/s/src/../src/Microsoft.Data.SqlClient/tests/UnitTests/Microsoft.Data.SqlClient.UnitTests.csproj" -p:Configuration=Debug --blame-hang --blame-hang-dump-type full --blame-hang-timeout 10m --filter "category=flaky" -f net9.0 -p:SqlClientPackageVersion=7.1.0-preview3-pr25103 -p:SqlServerPackageVersion=1.1.0-preview1-pr25103 --results-directory "TestResults" --logger:"trx;LogFilePrefix=SqlClientUnit-Unix-net9.0" " exited with code 1.

Check failure on line 53 in Build log

See this annotation in the file changed.

@azure-pipelines azure-pipelines / PR-SqlClient-Project (MacOSLatest_Sql25 net9_0_AnyCPU_ManagedSNI_2)

Build log #L53

Error: The process '/Users/runner/hostedtoolcache/dotnet/dotnet' failed with exit code 1

Check failure on line 56 in Build log

See this annotation in the file changed.

@azure-pipelines azure-pipelines / PR-SqlClient-Project (MacOSLatest_Sql25 net9_0_AnyCPU_ManagedSNI_2)

Build log #L56

Dotnet command failed with non-zero exit code on the following projects : [ '/Users/runner/work/1/s/build.proj' ]

Check failure on line 117 in Build log

See this annotation in the file changed.

@azure-pipelines azure-pipelines / PR-SqlClient-Project (MacOSLatest_Sql25 net9_0_AnyCPU_ManagedSNI_2)

Build log #L117

The Operation will be canceled. The next steps may not contain expected logs.

Check failure on line 118 in Build log

See this annotation in the file changed.

@azure-pipelines azure-pipelines / PR-SqlClient-Project (MacOSLatest_Sql25 net9_0_AnyCPU_ManagedSNI_2)

Build log #L118

The operation was canceled.