Skip to content

Latest commit

 

History

History
232 lines (199 loc) · 13.2 KB

BEATBOX_IMPACT_REDESIGN_TODO.md

File metadata and controls

232 lines (199 loc) · 13.2 KB

Open-BEATBox Documentation and Repository TODO

This tracker lists completed repository/documentation cleanup work and the remaining placeholders or unfinished text that must be resolved before the documentation can be considered stable.

Phase 1 - Repository entry point and public navigation

  • Make the top hero CTA path obvious.
    • Add Build your own as a primary hero button.
    • Keep View Open-Source Resources as a secondary hero button.
    • Reduce hero CTA ambiguity by using action-oriented labels.
  • Make the Assembly SOP CTA highly visible.
    • Move Open the interactive Open-BEATBox Assembly SOP directly below the Assembly Walkthrough section title.
    • Render it as a button, not a plain text link.
    • Keep the assembly video and SOP visually connected.
  • Replace the root README with a comprehensive repository entry point.
    • Link the project website.
    • Link the one-pager.
    • Link the Sphinx manual.
    • Link the interactive assembly SOP.
    • Explain repository structure from the root.
    • Explain resource-folder roles.
    • Explain local website and Sphinx documentation builds.
    • Explain license layers.

Phase 2 - Documentation system cleanup

  • Keep Sphinx as the canonical documentation system.
  • Remove the MkDocs deployment workflow.
  • Remove the MkDocs configuration file.
  • Update the GitHub Pages workflow so documentation changes trigger a full deployment.
  • Build the Sphinx manual before the Next.js static export.
  • Audit and migrate any still-useful legacy Markdown content from resources/docs/ into docs/source/.
  • Remove or archive legacy resources/docs/ files after migration so contributors are not presented with two documentation systems.
  • Update any remaining contributor text that still mentions MkDocs, resources/mkdocs.yml, or gh-pages-docs.

Phase 3 - Homepage narrative structure

  • Rework the first 2-3 scrolls around a clearer product story.
    • Shorten the hero headline into a direct promise.
    • Add a compact evidence/value strip for 24/7, open-source, home-cage, low-cost, and modular.
    • Move the most important real system visuals earlier.
  • Add a How Open-BEATBox works section.
    • Step 1: Home-cage access.
    • Step 2: Autonomous task engagement.
    • Step 3: Reward, sensors, screens, lighting, and tunnel modules.
    • Step 4: Continuous data acquisition and monitoring.
  • Add a Why it matters section.
    • Explain less handling and lower stress.
    • Explain higher data density and longitudinal acquisition.
    • Explain reproducibility and standardized workflows.
    • Include quantitative placeholders where exact numbers still need validation.

Phase 4 - Audience-specific paths

  • Add clear audience cards.
    • For scientists: scientific rationale, use cases, validation.
    • For builders: assembly SOP, BOM, CAD, PCB, practical warnings.
    • For developers: firmware, GUI, data pipeline, contribution path.
  • Add a production-oriented resources section.
    • Assembly SOP.
    • Bill of materials.
    • CAD / 3D print files.
    • PCB files.
    • Firmware.
    • Software GUI.
    • Protocol templates.

Phase 5 - Validation and credibility

  • Surface validation earlier.
    • Mention current beta-testing status.
    • List intended and tested behavioral use cases.
    • List validated modules and unresolved items.
    • Add a what is ready / what is still under construction block.
  • Add final citation instructions.
    • Add preprint, paper, DOI, or Zenodo citation metadata when available.
    • Keep a temporary How to cite placeholder until publication metadata exists.
  • Replace broad validation statements with quantitative evidence when available.
    • Add cost benchmark.
    • Add cable-length recommendations.
    • Add tracking-wall color recommendation.
    • Add long-term reliability notes.
    • Add finalized protocol templates.

Phase 6 - Sphinx manual placeholders to resolve

  • docs/source/build/assembly.md
    • Migrate the interactive SOP into a stable, versioned, non-interactive assembly guide.
    • Add required tools and pre-build checklist.
    • Add module-by-module assembly checkpoints.
    • Add final validation checklist before animal use.
  • docs/source/build/bom.md
    • Replace the placeholder BOM with a real table.
    • Add quantities.
    • Add supplier references.
    • Add acceptable substitutes.
    • Add revision compatibility notes.
    • Confirm BB_Feeder_IRBarrier_V1.1 naming.
  • docs/source/software/index.md
    • Add Raspberry Pi setup instructions.
    • Add firmware installation instructions.
    • Add Python GUI setup instructions.
    • Add monitoring-window documentation.
    • Add performance-dashboard documentation.
    • Add data-output format documentation.
    • Add troubleshooting section.
  • docs/source/protocols/index.md
    • Add at least one complete behavioral protocol template.
    • Add validation status by module or protocol.
    • Add QC criteria for experimental runs.
    • Add expected output fields and analysis-ready variables.
  • docs/source/hardware/pcbs.md
    • Add PCB version table.
    • Add board function by PCB.
    • Add connector and pinout links.
    • Add status: tested, beta, obsolete, or to confirm.

Phase 7 - Website content placeholders to resolve

  • site/content/beatbox.md
    • Replace Software stack TEST with final public heading.
    • Insert exact microcontroller model.
    • Insert chamber dimensions.
    • Insert reward-system details.
    • Insert power-supply specifications.
  • site/content/build-and-code.md
    • Replace TODO: link exact GitHub repo and hardware docs with exact resource links.
    • Add exact firmware commands.
    • Add exact microcontroller or controller type.
    • Link contribution guide and issue tracker.
  • site/content/get-beatbox.md
    • Clarify whether pre-assembled units are currently available.
    • Add vendors, pricing ranges, and ordering process if applicable.
    • Otherwise replace the TODO with Coming soon.
    • Clarify whether support/customization packages exist today.
    • Add request-a-quote/contact route if applicable.
  • site/content/home.md
    • Replace temporary citation language once publication metadata exists.
    • Verify that Build your Own capitalization is consistent with the rest of the website.

Phase 8 - Visual presentation

  • Improve visual hierarchy based on reference sites.
    • Use a cleaner hero with a sharper headline and immediate CTAs.
    • Add an early system workflow graphic or stepper.
    • Add real build evidence before deeper galleries.
    • Reduce long uninterrupted sections.
  • Improve module presentation.
    • Show feeder, screen, tunnel, lighting, wall, and base as a coherent modular system.
    • Keep detailed galleries lower on the page.
    • Connect assembly GIFs to the build path.

Phase 9 - Verification

  • Run npm run build during the previous redesign pass.
  • Confirm /docs/beatbox-assembly-sop.html still works during the previous redesign pass.
  • Confirm no new broken asset paths during the previous redesign pass.
  • Run python -m sphinx -b html -d docs/_build/doctrees docs/source site/public/docs/manual after the Sphinx workflow change.
  • Run npm run build after rebuilding the manual.
  • Check the homepage locally.
  • Check /docs/manual/ in the static export after the Sphinx build.
  • Check /docs/beatbox-assembly-sop.html in the static export after the deployment workflow change.
  • Triage the dependency audit before the final production release (npm ci reported 1 low, 4 moderate, 12 high, and 1 critical finding on 2026-09-01); review upgrades individually rather than applying a blind force fix.

Phase 10 - Lizbeth assembly-documentation handoff and public release

Source handoff: the assembly-tutorials repository contains the Master BOM in CSV/XLSX, one enclosure guide, five sub-module guides, and six 720p MP4 tutorial videos. All six are available in a temporary Google Drive handoff; final playback and archival locations remain YouTube and Zenodo respectively.

Website and repository integration - Damien / Eric

  • Link the modular tutorial index from the public build manual.
  • Link direct CSV and XLSX downloads from the public build manual.
  • Replace the placeholder build-guide directory with a pointer to the maintained tutorial repository.
  • Update the website build path and resources page to expose the tutorial repository and Master BOM.
  • Make the homepage Build your Own entry point open the consolidated build manual.
  • Document that assembly-tutorials owns the editable BOM and module guides, avoiding duplicate sources.
  • Pin assembly-tutorials as a Git submodule and render all six source guides directly inside Sphinx.
  • Keep the interactive SOP and modular Sphinx rendering as two explicit alternatives for comparison.
  • Embed all six delivered Drive videos on their matching Sphinx module pages without committing MP4 files.
  • Eric: approve the final information architecture and public video-hosting choice.
  • Damien: replace all temporary Drive URLs with YouTube URLs and add thumbnails.

Master BOM release gate - Pierre

  • Complete or validate every doubtful field directly in BOM.xlsx.
  • Replace placeholder values such as question marks, path to file, unknown suppliers, and unspecified revisions.
  • Resolve duplicate IDs in the current CSV: FST-M3X8, FST-M3X10, and PCB-PBG-002.
  • Give the 600 mm photobeam cable its own CBL-* identifier instead of PCB-PBG-002.
  • Reconcile naming mismatches used by tutorials, including TOL-FORC / TOL-FORC-, TBC-CBL-PBG-001, FST-M5X5, FST-M3X6-SHCS, FST-M3X8-SHCS, and TBC-M3-FASTENER.
  • Verify every fabrication path against the actual repository, including filename case and extension.
  • Confirm quantities per complete Open-BEATBox, especially the two screen modules.
  • Add hardware revision compatibility and a BOM version/date.
  • Regenerate BOM.csv from the approved XLSX and verify both formats are equivalent.

Tutorial release gate - Damien / Pierre

  • Correct filename typos and standardize guide names (mod-fdr-aseembly.md, mod-lgt.md).
  • Replace 0.1-draft, blank hardware_revision, and YYYY-MM-DD in all six guides with approved release metadata.
  • Ensure every item ID in each module parts table exists exactly once in the approved BOM.
  • Resolve prose and hardware placeholders before publication (for example unspecified fasteners and instructions that only say to consult a video).
  • Add required tools, electrical checks, mechanical checkpoints, and final animal-facing safety checks to every relevant guide.
  • Perform one clean-room documentation pass using only the BOM and tutorials; record corrections as issues.
  • Tag the approved tutorial repository release as v1.0 and link that immutable release from the website.

Video publication - Damien / Eric

  • Collect all six source MP4 files in the temporary project staging folder and map each one to its module guide.
  • Do not commit the approximately 1 GB video set to the website Git history.
  • Select project YouTube for public streaming and Zenodo for the versioned archival deposit/DOI.
  • Confirm every temporary Drive file is viewable without authentication while it is linked from the public site.
  • Rename each file using <module-id>_<step>_<action>_<view>.mp4.
  • Produce a thumbnail and captions or transcript for each video.
  • Confirm each video maps to one of: frame, water bottle mount, feeder, light ring, photobeam gate, or screen.
  • Replace the temporary Drive embeds with public YouTube URLs next to the relevant written steps and in docs/source/build/video-tutorials.md.
  • Test playback on desktop and mobile and confirm that no temporary or private Drive URL remains in the final public release.

System validation - Zenneddine / project team

  • Record the ICM-built unit's hardware revision and serial/build identifier.
  • Use the ICM unit for code integration tests and log results against the matching hardware and BOM versions.
  • Verify feeder motor/rotor, both screens, IR boards, photobeam gate, light ring, cabling, and full-system communications.
  • Feed every hardware/documentation discrepancy back into the corresponding tutorial or BOM issue.
  • Publish a short validation record and define the criteria for declaring documentation v1.0.

Final release acceptance

  • BOM has no unresolved required fields or duplicate identifiers.
  • All six written guides have approved revisions and verification dates.
  • All six videos have durable public URLs, captions, and thumbnails.
  • Website, Sphinx manual, interactive SOP, tutorial repository, and BOM cross-link correctly.
  • Documentation and website builds pass; links and video playback are manually checked.
  • A versioned release and concise changelog are published.