Skip to content

Latest commit

 

History

History
105 lines (76 loc) · 6.46 KB

ROADMAP.md

File metadata and controls

105 lines (76 loc) · 6.46 KB

MARC on Stellar — Roadmap

Single-page status tracker. If you're a Claude agent picking up this project, read this file first — then CLAUDE.md for rules/gotchas, then docs/plans/2026-04-11-marc-stellar.md for the full step-by-step.

Goal: Ship MARC (commerce layer for agent payments) on Stellar testnet in 48h. Two Soroban contracts + TS SDK + CLI demo + landing page. Deadline: 2026-04-11 + 48h. Hackathon: Stellar Hacks: Agents (x402 × Stripe MPP).


Current state

Phase: 7 (Submission Materials) Last completed: Phase 6 — Landing page shipped at landing/index.html with hero, protocol stack, how-it-works, contract addresses, SDK snippets, i18n, consent banner, and Vercel deploy config ✅ Next action: Phase 7 Task 7.1 — finalize README for submission

Deployed contracts (testnet):

  • agent_identity = CAMPXYFZJTIPEVOPOAZPRG5OHXKNBDPGTPRCOIO4LVPGEM4TONPY65A5
  • agentic_commerce = CD2KWU7IE74Z2QKVP3FQ67J46XHNMGIDTNKXVWE7ZNVRC7T6UH46GQXE
  • deployer = GA5VIZYCUM3IUZZNQTTB7YSLJSE5WZ2EI5EGWNLTWQ234SLSH45MPKX3

Phase tracker

# Phase Status Tasks Notes
0 Workspace scaffolding ✅ done 3/3 Rust workspace + SDK + demo + landing + scripts
1 agent_identity contract ✅ done 5/5 7 tests green, 4.2 KB WASM, 6 entry points
2 agentic_commerce contract ✅ done 7/7 12 tests green, 9.4 KB WASM, 10 entry points, 99/1 fee split verified
3 Testnet deployment ✅ done 3/3 Both contracts live, init invoked, fee_bps=100 verified
4 TypeScript SDK ✅ done 6/6 types, IdentityClient, CommerceClient, marcPaywall, marcFetch, index — all compiled, runtime verified
5 CLI demo ✅ done 4/4 seller-agent, buyer-agent, lifecycle orchestrator, testnet dry run — job #1 completed, 99/1 split verified
6 Landing page ✅ done 4/4 HTML + CSS + JS + Vercel deploy — landing/index.html shipped with full protocol stack, contracts, SDK snippets, i18n, and consent banner
7 Submission materials ⬜ todo 0/6 README, LIGHTPAPER, PROTOCOL, pitch video, DoraHacks form, git tag

Phase 2 task breakdown (what we're doing right now)

# Task State Green criteria
2.1 Scaffold agentic-commerce crate + init + smoke test ✅ 2 tests: init sets state, double-init panics
2.2 create_job with token escrow pull ✅ Budget moves buyer → contract; status = Funded
2.3 submit (provider-only guard) ✅ 2 tests: happy + non-provider panic
2.4 complete with 99/1 fee split ✅ Seller 99k, treasury 1k, contract 0
2.5 cancel refund path ✅ Full budget back to buyer, status = Cancelled
2.6 set_treasury + set_fee_bps (admin, 5% cap) ✅ 3 tests: admin update + 501 bps panic + non-admin reject
2.7 Build release WASM + optimize ✅ 9387 B, 10 entry points, clippy clean

Actual: 12 tests green, WASM 9.4 KB, zero clippy warnings. ✅


Downstream dependencies (what each phase unlocks)

Phase 0 (scaffold)
  └─> Phase 1 (agent_identity) ✅
       └─> Phase 2 (agentic_commerce) 🚧
            ├─> Phase 3 (deploy both contracts)
            │    └─> Phase 4 (SDK wrappers — needs deployed addresses)
            │         └─> Phase 5 (CLI demo — needs SDK + deployed addresses)
            │              └─> Phase 7.4 (pitch video — films the demo)
            └─> Phase 6 (landing page — independent, can run parallel)
                 └─> Phase 7.1-.3 (README + lightpaper — references everything)
                      └─> Phase 7.5-.6 (DoraHacks submit + git tag)

Critical path: 2 → 3 → 4 → 5 → 7.4. If any of these breaks, we have no demo to ship.


Cut list (if we fall behind, in order)

  1. Orange particle background animation
  2. How-it-works section on landing
  3. docs/PROTOCOL.md (reference only — lightpaper is enough)
  4. cancel entry point + its test (only if literally cannot compile)
  5. Landing page entirely — ship just README + video

Never cut: both contracts, the CLI demo, the pitch video, the README.


Where to find things

  • Operating rules + gotchas: CLAUDE.md (auto-loaded into Claude context every session)
  • Full step-by-step plan: docs/plans/2026-04-11-marc-stellar.md
  • Locked scope + contract designs: docs/superpowers/specs/2026-04-11-marc-stellar-design.md
  • Visual design tokens + landing specs: docs/design-system.md
  • Hackathon resources (x402, MPP, Soroban): .claude/skills/stellar-hackathon/SKILL.md
  • Original MARC Solidity (shape reference only, don't copy): /Users/ram/Desktop/marc/contracts/

Update protocol

After every task completes:

  1. Check the box in the "Phase task breakdown" table above
  2. Bump "Last completed" and "Next action" at the top
  3. When a whole phase finishes, flip its row to ✅ and move to the next phase row
  4. Commit the ROADMAP.md change alongside the task's feature commit (or as a separate docs: roadmap commit)